ORC & WASTE HEAT RECOVERY

Efficient preheaters, evaporators and condensers for ORC systems

Compact plate and shell equipment can reduce working-fluid charge, installation footprint and heat-transfer irreversibility.

Evaluate an ORC Duty
ORC equipment

Heat exchangers across the organic Rankine cycle

PreheaterRaises liquid working fluid toward bubble point using low-grade heat.
EvaporatorVaporizes the organic working fluid with controlled pressure drop and distribution.
SuperheaterProvides controlled superheat where required by the expander.
CondenserCondenses working fluid using cooling water or another cooling system.
System benefits

Compact equipment supports packaged ORC design

  • Reduced internal volume lowers working-fluid charge
  • High heat-transfer coefficient reduces equipment footprint
  • Close temperature approach can improve cycle efficiency
  • Welded construction is compatible with many organic fluids
  • Pressure-vessel design supports elevated working-fluid pressure
  • Multiple plate patterns allow liquid, boiling and condensing duties

Two-phase design matters

ORC evaporators must distribute working fluid evenly while limiting pressure drop. Heat-source glide, pinch point and phase-zone allocation are evaluated together rather than using a single average coefficient.

Engineering inputs

Key ORC design factors

Heat-source profile

Flow, inlet/outlet temperature, condensation or sensible cooling.

Working fluid

R245fa, R124 or project-specific organic fluid properties.

Pinch point

Temperature approach across preheating, boiling and superheat zones.

Pressure drop

Impact on pump work, saturation temperature and expander performance.

Control range

Startup, partial load, heat-source variation and shutdown cases.

REPRESENTATIVE ORC CASE

2 × 900 kW fertilizer-plant waste-heat recovery

ARO supplied plate and shell heat-exchanger duties for preheating and evaporation of R245fa using hot water from an industrial process.

Heat sourceHot water, 143/120°C
Heat-source flow300 t/h
Working fluidR245fa
Working-fluid flow130 t/h
Design pressure25 bar
EquipmentPreheater + evaporator